How to Keep Reporting Running Through an ERP Migration
At the end of 2027, SAP ends mainstream maintenance for the core of SAP Business Suite 7, which includes ECC. Gartner estimated that by the end of 2024, only 39% of about 35,000 ECC customers had moved to S/4HANA. Gartner expects about 17,000 of them to still be on ECC in 2027.
SAP is one trigger among many. An acquisition or a split from a parent company can start the same kind of project.
Give your reports their own plan, and start it before cutover
An ERP program plans how transactions move. The reports your leaders use each week need a plan of their own. Start it early. Finance and operations then keep the numbers they steer by while the system under them changes.
What the 2026 numbers say
The move is well under way. ASUG, the Americas' SAP Users' Group, runs a yearly survey of its members. In its 2026 study, 56% were live on S/4HANA or had begun to move. In 2024 the figure was 45%.
Data is where the strain shows. In the same study, 35% said they struggle to get useful insight from their data. That is up 8 points on the year before. And 48% named integration as a challenge.
Projects run long, too. In a late-2025 survey by Precisely and ASUG, 30% said their SAP migration was late or over budget. The top hurdles were changes to business processes (49%) and custom code (44%).
Why reports are the hardest part to move
Your reports hold years of business logic. Some of it sits in custom fields and spreadsheets. A lot of it sits in people's heads.
When the ERP changes, each piece has to be found and written down before it can be rebuilt. A new system can also split or merge fields, so a figure that matched last year may not match next year.
A leader might see one ERP migration in a whole career. Migration is one of our service lines, so we work through these moves with clients far more often. In our experience, the hardest part is the knowledge around the data: what each figure means and why.
Rebuilding reports after go-live
One common plan is to rebuild reports once the new ERP settles. It has a clear upside. The ERP team stays focused on the core system, and the report work waits for stable data.
The cost shows up in the gap. For weeks or months, leaders have no past figures to compare against. History sits in the old system. Finance can end up running two sets of numbers side by side. If that gap lands at year-end or during a deal, the risk grows.
Six steps to keep reporting running
List the reports that matter. Note who uses each one and which decision it supports. This tells you what to move first.
Write down the logic. Capture the rules in each report, including the ones that live in people's heads.
Map old fields to new ones. Agree what counts as a match for each key figure before any data moves.
Move data in batches, highest value first. Sales data comes before reference tables. Run a practice load, then get sign-off before the next batch.
Check the totals. Compare key figures between the old and new systems. Explain each gap before cutover, and log it.
Keep the history. Load history from the old system into a data platform that sits beside both ERPs. Your trend reports then span the old and new systems.
Step six does the most for leaders. With history on one platform, a CFO can set this quarter beside the same quarter last year. It does not matter that the two came from different systems.
What to do in the next 90 days
If you face the 2027 deadline, or any ERP change in the next 18 months, start the report list now. It needs no budget, and it shows the true size of the job.
Then name one owner for reporting inside the ERP program. Give that person a budget line of their own. Ask your ERP partner two things. How will history be kept? How will key figures be checked before cutover?
Plan the reporting side of your move. Book a Platform Assessment. We will map the reports your leaders rely on and show what it takes to keep them running. [CHECK: link, and confirm the assessment covers this]
Frequently asked questions
When does SAP ECC support end?
For ECC 6 on enhancement packs 6 to 8, SAP's mainstream maintenance ends at the end of 2027. Older packs lost it at the end of 2025. Optional extended maintenance runs from 2028 to the end of 2030. It costs two percentage points on top of the usual maintenance fee, per SAP's 2020 notice.
How long does an ERP migration take?
It depends on scope and on how much custom code you carry. For SAP S/4HANA moves, Gartner says its clients expect projects to take three to seven years. Smaller moves can be much shorter.
How do you keep historical data after an ERP migration?
Load history from the old ERP into a data platform that sits beside the new one. Map the old fields to the new meanings. Your reports can then show trends across both systems.
What is reporting continuity?
Reporting continuity means leaders keep getting the reports they need while systems change. The figures and their meanings stay the same, with enough history to compare one year with the next.